Electrical and motion-control design for an 80-tonne self-propelled formwork trolley — travelling along a track with three-axis Cartesian positioning to enable rapid concrete wall pour cycles on a major civil project.
A national construction company needed a formwork solution that could keep pace with an aggressive concrete pour cycle on a major civil project.
The system had to handle an 80-tonne formwork structure, position it precisely along the wall, and let the site team advance pours without rebuilding the form from scratch each time.
An 80-tonne self-propelled formwork trolley with three-axis Cartesian motion — travelling along a fixed track and positioning the form in X, Y and Z.






The construction team can reposition and re-pour without rebuilding the form between cycles.
Whether it’s a single component, a full system migration, or you’re not sure where to start — we’ll scope the work with you and come back with a realistic plan. Most initial responses inside one business day.